16.11 Emergency generator load support
If a Multicluster system fails, manual operation via the generator is possible. For this purpose, the
generator must be started manually, directly at the generator. As soon as a voltage is present, the
Multicluster Box connects the generator through to the loads, without there being a Sunny Island in
operation.