SMA America, LLC
Initial Start-up
Technical Description
SI5048U-TUS121440
67
The QCG is automatically activated during the initial start-up of the Sunny Island. In this case begin
with point 3. If the QCG is not activated automatically, begin with point 1.
1. Switch the Sunny Island's DC circuit breaker to the ”ON” position.
☑ The Sunny Island initiates the start-up phase. The
notifications shown here are displayed. The last
notification is displayed as soon as the start-up
phase is completed.
2. Press and hold down <Enter> until the Sunny Island beeps three times.
☑ The QCG is started.
–
”Start System”
(if you have accidentally accessed the QCG and would only like to restart
the system)
–
”New System”
(if you would like to start a new system or perform changes to the system
configuration)
–
”New Battery”
(if you wish to reset battery-specific parameters only. You cannot change
general parameters using ”New Battery”)
–
”Emerg. Charge”
(if you would like to charge a deeply discharged battery using an
external source)
Systems with several Sunny Islands
If you have a system with more than 1 Sunny Island, you must take the following measures:
• Configure the Sunny Island with the latest firmware version as master or install the
latest firmware version in the master (see www.SMA‑America.com). The master
updates the firmware of the slaves once the off‑grid system is started.
•
You must first run the QCG on the slave(s)
before starting the master device
(display message "INIT MASTER OK START?"). Only the device type is set there.
Only start the master device thereafter!
SIBFSBOOT V1.004
SI5048
@SMA 2009
01#StartMenu
Start System