9 Activation and Deactivation
9.1 Activation / Startup
This step assumes that the Sunny Island 5048 has been checked for
•
correct (electrical) connections,
•
voltages and polarities
and has already been put into operation by suitably qualified personnel
(qualified electrician).
1.
Switch on the Sunny Island 5048 by switching the DC circuit breaker to the "ON"
position.
2.
The Sunny Island 5048 starts the startup phase. Wait for
the following displays.
As soon as the startup phase is finished, the message "To init
system hold <Enter>" is displayed.
3.
If you would like to access the QCG, press and hold
<Enter> until the Sunny Island 5048 beeps three times.
Then the following display message appears (on how to
proceed further, see section 8.2 "Starting the Quick
Configuration Guide (QCG)" (Page 57)).
4.
If you do
not
press <ENTER> within 5 seconds, the
Sunny Island 5048 skips the QCG and shows the
following message.
Start the slaves
before
you start the master device.
SIBFSBOOT V1.000
SMA SMA SMA SMA
SMA SMA SMA
SI5048
@SMA 2006
To init system
hold <Enter>
01#StartMenu
New System
↵
Standby-To start
press <ENTER>
Summary of Contents for Sunny Island 5048
Page 22: ...The Sunny Island 5048 SMA Technologie AG Page 22 SI5048 11 EE4206 Technical Description...
Page 26: ...Safety Instructions SMA Technologie AG Page 26 SI5048 11 EE4206 Technical Description...
Page 94: ...Battery Management SMA Technologie AG Page 94 SI5048 11 EE4206 Technical Description...
Page 114: ...Connecting External Sources SMA Technologie AG Page 114 SI5048 11 EE4206 Technical Description...
Page 160: ...Contact SMA Technologie AG Page 160 SI5048 11 EE4206 Technical Description...
Page 169: ...SMA Technologie AG Glossary Technical Description SI5048 11 EE4206 Seite 169...
Page 171: ......