Operation
SMA
Technologie AG
Page 66
SI5048-11:EE4206
Technical Description
The Sunny Island 5048 utilizes an operation concept referred to as
"Single Point of
Operation"
. For a system with more than one device, all entries are made on the
master. There you configure the entire system, confirm events, warnings as well as errors
in the QCG (see section 8 "(First) Commissioning" (Page 57)) and update your firmware
when required (see section 11.7 "Firmware Update" (Page 81)).
Exception:
When starting the device for the first time, you must set the slave in the QCG
and everything else is performed at the master.
10.1 Menu Structure
The menu structure is divided into two levels:
•
User level
•
Installer level
The menus allowing system parameters to be changed can only be reached after
entering the installer password (see section 10.5 "Entering the Installer Password" (Page
72)). These menu parameters can be used to monitor and control the Sunny Island
5048 in normal daily operation.
Slave devices must wait for commands from the master devices. The following
message appears during this time.
Ready
Wait for Master
Messages can be displayed at any time while the device is in operation and they
have priority over the Home Screen display.
Configuration and changes to system parameters may only be performed
by suitably qualified personnel (electricians).
Summary of Contents for Sunny Island 5048
Page 22: ...The Sunny Island 5048 SMA Technologie AG Page 22 SI5048 11 EE4206 Technical Description...
Page 26: ...Safety Instructions SMA Technologie AG Page 26 SI5048 11 EE4206 Technical Description...
Page 94: ...Battery Management SMA Technologie AG Page 94 SI5048 11 EE4206 Technical Description...
Page 114: ...Connecting External Sources SMA Technologie AG Page 114 SI5048 11 EE4206 Technical Description...
Page 160: ...Contact SMA Technologie AG Page 160 SI5048 11 EE4206 Technical Description...
Page 169: ...SMA Technologie AG Glossary Technical Description SI5048 11 EE4206 Seite 169...
Page 171: ......