SMA Solar Technology AG
5 Starting and Stopping the Off-Grid System
Operating Manual
SI80H-BE-BEN120810
37
5 Starting and Stopping the Off-Grid System
5.1 Switching On the Off-Grid Inverter
Requirements:
☐ BatFuse must be closed.
☐ The off-grid inverter may not have switched itself off (see Section 10.6 "Charging the Battery
after Automatic Shutdown", page 63).
• When using one off-grid inverter in the off-grid
system, press the activation button on the off-grid
inverter.
• In single-cluster systems, press the activation button
on the master and hold it until you hear a signal.
• In Multicluster systems, press the activation button
on each master of the individual clusters and hold it
until you hear a signal.
☑ The inverter LED on every off-grid inverter is glowing
orange and the off-grid inverters are in standby mode.
5.2 Starting the Off-Grid System
Requirement:
☐ All off-grid inverters must be switched on.
• Press the start-stop button on the off-grid inverter
and hold it until you hear a signal.
or
Press and hold the button on the Sunny Remote
Control until you hear a signal.
☑ The inverter LED is glowing green on every off-grid inverter.