Sunny Island
Installation & Operating Instructions
BWRI33-12:EE
- 10 -
SMA Regelsysteme GmbH
1.1 About these instructions
This document contains important information for the installation and commissioning of
the Sunny Island as well as its safe operation. Please read these instructions carefully
before starting the inverter. The inverter must be installed and commissioned by quali-
fied personnel. Work must be carried out according to the local installation and safety
regulations. Please also refer to our warranty and liability terms at the end of this docu-
ment.
This version of Installation and Operating Instructions considers the new features of
Firmware BFR 1.50 / DSP 1.50 and higher. Basically, these Instructions continue to
refer to inverters with firmware BFR 1.10, however discrepancies concerning the pa-
rameters/data available can arise. Please note that changes have been made com-
pared to earlier versions (before Firmware BFR 1.10) as regards generator control
(allocation of relays), (see chapter 3.4.6).
1.2 What to do in case of transport damages?
Our products are thoroughly checked before they are shipped. Even though they are
delivered in sturdy packaging (which can be recycled) the inverters can be damaged
in transit which is usually the forwarder’s fault.
Please inspect your inverter thoroughly after it has been delivered. If any damages
can be detected on the packaging that could make you conclude the contents is
damaged or if you detect any damage please immediately notify the forwarding com-
pany.
SMA or your local supplier can help you in this matter. In any case a declaration of
transport damage must be made within six days upon receipt of the product and
must be stated in writing directly to the forwarding agent.