Sunny Island
Installation & Operating Instructions
BWRI33-12:EE
- 140 -
SMA Regelsysteme GmbH
„PARALL“ (3+9)
Parameter Unit
Min.
Max.
Default
Description
641_BHKW_Toff
s
0
10000
300
Minimum pause time of the Ecopower CHP
642_BHKW_Tmax
s
0
20000
0
Maximum run-time of the Ecopower CHP in mode 2
(fast control)
644_PldOnLx
W
0
3300
0
The Ecopower CHP will be activated when this load
at one phase has been exceeded
701_Man K1
0
2
0
Operating mode of relay K1
0: OFF:
Switch relay K1 off
1: ON:
Switch relay K1 on
2: AUTO:
Sunny Island automatically con-
trols relay K1.
702_Man K2
0
2
0
Operating mode of relay K2
0: OFF:
Switch relay K2 off
1: ON:
Switch relay K2 on
2: AUTO:
Sunny Island automatically con-
trols relay K2.
703_Man K3
0
2
0
Operating mode of relay K3
0: OFF:
Switch relay K3 off
1: ON:
Switch relay K3 on
2: AUTO:
Sunny Island automatically con-
trols relay K3.
704_Man K4
0
2
0
Operating mode of relay K4
0: OFF:
Switch relay K4 off
1: ON:
Switch relay K4 on
2: AUTO:
Sunny Island automatically con-
trols relay K4.