Sunny Island
Installation & Operating Instructions
BWRI33-12:EE
- 85 -
SMA Regelsysteme GmbH
Fig. 8.8: Menu “PARGEN“ (3+6)
“PARGEN“ (3+6)
Name
Description
602_GenSet Type
None:
No generator present in island grid
Grid forming:
Generator forms the grid
Grid tied:
Sunny Island has to form the grid
Mains:
Sunny Island is operated on public utility grid
BHKW-Mains
Sunny Island is operated together with the Ecopower CHP
and on the public utility grid
BHKW-Island
Sunny Island is operated solely together with the Ecopower
CHP
Mains form
Sunny Island is operated together with a grid-forming gen-
erator and on the public utility grid
fast Grid form
Generator is grid-forming and it is switched between the
generator and the Sunny Island without interruption (special
installation measures are necessary for this)
fast Mains
The Sunny Island is operated on the public utility grid and it
is possible to switch from the Sunny Island as grid-former to
the public utility grid without interruption (special installation
measures are necessary for this).
fast Mains form The Sunny Island is operated together with a grid-forming
generator and on the public utility grid. Switching takes place
without interruption (special installation measures are nec-
essary for this)
603_GenSet Interf
None:
no generator start by Sunny Island
Type 1:
Autostart, relays K1+K2
Type 2:
3 contacts run / start, relays K1, K2, K5
Type 3:
3 contacts run / Stopp, relays K1, K2, K5
EcoPower
Ecopower
CHP
(see also chapter 16 “Starting phase sequence of different generator types”)