Sunny Island
Installation & Operating Instructions
BWRI33-12:EE
- 9 -
SMA Regelsysteme GmbH
1 Introduction
By purchasing a Sunny Island you have decided to use one of the most advanced
modular battery inverters. The Sunny Island complies with the according European
harmonized standards on electromagnetic compatibility as certified in the CE decla-
ration (see appendix).
In the following you will find the installation and operating instructions of the Sunny
Island battery inverter. Don’t worry about the size of the document, it is not neces-
sary to read everything at once. This is both installer’s guide and user manual, so it
is used as reference for the commissioning and as guideline on how to use all func-
tions of the inverter optimally and how to extend your existing PV-plant. For detailed
information on system realization, functions and the integrated battery and load
management please refer to the Product Description.