12 Troubleshooting
SMA Solar Technology AG
Operating Manual
STPx0-3SE-40-BE-en-10
111
Event number
Message, cause and corrective measures
10520
Supplied power: [xx] W (permitted value: [xx] W)
The set active power limitation cannot be met.
Corrective measures:
• Ensure that the correct active power limitation has been configured.
• Ensure that the PV inverters have been configured correctly.
• Ensure that the communication between battery inverter and PV inverter
functions perfectly.
• Ensure that no external feeders are in the system.
10521
Active power was limited today for [xx] minutes.
The active power limitation of the PV inverters was limited for the specified
time.
10525
Inverter does not respond to active power limitation.
10528
Login for NSD function on device |s0| failed
27107
Update file OK
The update file found is valid.
27108
Memory card is being read
The storage medium is being read.
27109
No new update on the memory card
A new update file was not found on the storage medium.
27301
Update communication
The inverter is updating the communication component.
27302
Update main CPU
The inverter is updating the inverter component.
27312
Update completed
The inverter has successfully completed the update.
27329
Condition test successful
The testing of the update conditions was successful. The firmware update
package is suitable for this inverter.
27331
Update transport started
Update file is being copied.
27332
Update transport successful
Update file was copied successfully to the inverter's internal memory.
27336
Battery management system
Summary of Contents for SUNNY TRIPOWER 10.0 SMART ENERGY
Page 132: ...www SMA Solar com...