6 Mounting
SMA Solar Technology AG
Operating Manual
STPx0-3SE-40-BE-en-10
35
300
300
300
350
473
473
536
505
100
Figure 12: Recommended clearances(Dimensions in mm)
6.2
Mounting the product
Additionally required mounting material (not included in the scope of delivery):
☐ 3 screws, suitable for the support surface and the weight of the inverter (diameter: minimum
6 mm)
☐ 3 washers, suitable for the screws (outer diameter: minimum 18 mm)
☐ Where necessary, 3 screw anchors suitable for the support surface and the screws
CAUTION
Risk of injury due to weight of product
Injuries may result if the product is lifted incorrectly or dropped while being transported or
mounted.
• Transport and lift the product carefully. Take the weight of the product into account.
• Always have two persons mount and disassemble the product.
• Wear suitable personal protective equipment for all work on the product.
Procedure:
1. Align the wall mounting bracket horizontally on the
wall and mark the position of the drill holes. Use at
least 1 hole on the right- and left-hand side and the
lower hole in the middle of the wall mounting
bracket.
UP
2. Set the wall mounting bracket aside and drill the marked holes.
Summary of Contents for SUNNY TRIPOWER 10.0 SMART ENERGY
Page 132: ...www SMA Solar com...