7 Electrical Connection
SMA Solar Technology AG
Operating Manual
STPx0-3SE-40-BE-en-10
40
6. For a cable diameter of ≥ 19 mm, remove the inner
sealing ring from the AC connector.
7. Route the AC cable through the swivel nut and
connector enclosure.
8. Dismantle the AC cable (80 mm to 90 mm).
9. Strip the insulation of L1, L2, L3, N and the grounding conductor (12 mm).
10. Insert the conductors L1, L2, L3, N, and grounding
conductor into the terminal block according to the
labeling and tighten the terminal block screws (PH2,
torque: 1.5 Nm).
2
1
11. Ensure that the conductors are correctly assigned and firmly seated in the terminal.
12. Insert the terminal into the connector enclosure. The
terminal must snap audibly into place.
13. Tighten the swivel nut on the connector enclosure.
Summary of Contents for SUNNY TRIPOWER 10.0 SMART ENERGY
Page 132: ...www SMA Solar com...