Maintenance Procedure
4.5
Figure 4.6 – Four Possible Display Positions
Screw the display on the main board (3).
Then tighten the display cover (1) to complete the assembly procedure. The converter is ready for
mounting and testing.
Electric Connections
A plug must be installed on the non-used electric connection to avoid humidity. The plug must
comply with the equipment area.
Interchangeability
The main board can be replaced by a similar one for the converter to work normally. There is an
EEPROM on the transducer that stores the trim value, hence avoiding the need for a re-calibration.
Packaging Contents
Check the packaging content. The supplied quantity marked with a (*)comply with the number of
converters.
•
Fieldbus Converter
•
Mounting Bracket
•
Magnetic tools for local configuration (*)
•
Restriction Cleaning Needle (*)
•
Instructions Manual (*)
•
CD with Smar device library.
Summary of Contents for FP302
Page 1: ...ION FP302 F P 3 0 2 M E ...
Page 7: ...Kpuvcnncvkqp Hnqyejctv XKK ...
Page 8: ...HR524 Qrgtcvkqp Ockpvgpcpeg cpf Kpuvtwevkqpu Ocpwcn XKKK ...
Page 18: ...FP302 Operation Maintenance and Instructions Manual 2 4 ...
Page 37: ...Configuration 3 19 Figure 3 18 Step 1 Figure 3 19 Step 2 Figure 3 20 Step 3 ...
Page 40: ...FP302 Operation Maintenance and Instructions Manual 3 22 ...
Page 50: ...FP302 Operation Maintenance and Instructions Manual 4 10 ...
Page 54: ...FP302 Operation Maintenance and Instructions Manual 5 4 ...
Page 60: ... Crrgpfkz C C08 FM Approvals Factory Mutual ...
Page 61: ... Crrgpfkz C C09 Canadian Standards Association CSA ...
Page 62: ...HR524 Qrgtcvkqp Ockpvgpcpeg cpf Kpuvtwevkqpu Ocpwcn C0 ...