Step 2
Front Wall Assembly
To make a free-standing structure, tie the
front wall into the keel assembly with
Maxifix pins and cams. Do this in the final
position for the VISTA installation.
800 770 7042 SMARTdesks Technical Assistance
6
www.smartdesks.com
Maxifix Cam
262.87.003
Maxifix End Pin
262.87.781
Install the uprights and shelf
Use dowels to hold the uprights in place. Each upright uses 12 dowels.
Install the shelf to the uprights using 2 dowels to the front wall and 4
Minifix pins and cams.
Install the Standoffs to the front wall, screwing in the end caps with the
Fixed Pin Spanner Wrench.
Uprights
Dowels
Shelf
Stand-Offs
Stand-Offs
Stand-Offs
Dowels
Dowels
Fixed Pin Spanner
Wrench
Used for tightening the
Stand Off Bar End Caps
Upon completion, if you are
working on Mark 15, tie in the
second Keel Assembly using
pins and cams.
At this point, coordinate with
IT to let them install the tech-
nology, including the Video
Monitor Mount.
When it is time to mount CPU
holders, IT should notify that
the table tops can be applied.