RotaScope Classic Cabinet
Manual Version
1.04
Date
23 November 2021
75
4.2.2
Free Standing Cabinet Wall Mount
Single Door cabinets require the top of the cabinet to be mounted to the wall to
ensure stability. The supplied bracket should be mounted to the top of the cabinet
and secured to the wall, preferably into solid structure or stud. See below.
4.2.3
Pass Through Units
If specifically ordered, Pass-Through cabinets may be supplied with a rear door,
which includes a display screen, and scanner. The function of the rear door screen is
exactly the same as the front door screen. The rear door allows scopes to be loaded
in the Reprocessing Room but unloaded in the Procedure Room (Operating
Theatre). Power and data points should have been installed during building
construction of the wall, so that cables neatly pass from the top of the cabinet to
the power and datapoints. Consult appropriate wall cut out drawings in the
Smartline Distributor Portal for wall cut out size and GPO positioning.
The cabinets are trimmed and neatly fitted into the wall with small flashings (Cover
strips) that seal the cabinet into the wall preventing room air exchanging between
the rooms. Ensure these are sealed to the cabinet and wall using silicone or a similar
sealant.