Smart Power Systems Network Power Management System
12
[UPS->Outlet Action->Outlet Control]
The
Outlet Control
page shows the state of all outlets
and allows users to do outlet on/off control. The outlet in a pending command state will be notated
as *.
Item
Definition
Control Action
Turn On
Selected outlet(s) will be turned on immediately.
Turn On + Delay
Selected outlet(s) will be turned on after each outlet's Power On
Delay.
Turn Off
Selected outlet(s) will be turned off immediately.
Turn Off + Delay
Selected outlet(s) will be turned off after each outlet's Power Off
Delay. This action could signal PC to shutdown, if the software Smart
PowerMaster Enterprise Edition Client is installed on PC.
Reboot
Selected outlet(s) will be turned off immediately, and then be turned
back on after each outlet's Reboot Duration.
Delay
Selected outlet(s) will be sequenced off after each outlet's Power Off
Delay. Then they will be synchronized after the largest Power Off
Delay and the largest Reboot Duration of the selected outlets and be
sequenced on after each outlet's Power On Delay.
Cancel Pending
Command
Selected outlet(s) will be turned off immediately.
[UPS->Outlet Action->Outlet Schedule]
Sets the outlet to automatically turn off and restart
according to the scheduled times (one time/per day/per week). The
Outlet Schedule
page lists all
configured schedules and the related information. Each schedule row displays detailed information
of each schedule such as when the schedule will take effect and when to perform it. Users can
manage each schedule through this page. (Only available for switch models)
Item
Definition
AutoPing
Status
The scheduled event status. (Enabled/Disabled)
Name
The name to call the specific scheduled event.
Action
The action which will be performed when the scheduled event takes place.
Action Time
The time when the scheduled event takes place.
Frequency
The frequency which the scheduled event takes place.
Once - Scheduled event takes place on the configured date and time
once.
Daily - Scheduled event takes place at the configured time every day.
Weekly - Scheduled event takes place on the configured date and time
every week.
Outlet
Outlet(s) that is/are selected for the scheduled event.