background image

Drive Startup Manual KEB-PM  

 

 

Page 2 

© 2019 Smartrise Engineering, Inc. All Rights Reserved  

August 23,2019 

Grounding Requirements 

NOTE: A proper and effective building ground connection is required for the safe and successful 
operation of the controller. 

Examples of a proper building-to-controller ground is as follows: 

 

Attach the ground wire to the street side of a water main. 

 

Attach the ground wire to a grounding rod in the pit. 

The controller has a common ground bus terminal connection. 

 

 

Figure 3: Ground Bus Terminal 

 

The building, motor, transformer, and filter(s) must all share a common ground. This 
removes ground loops, limits impedance, and routes noise into the ground. 

Summary of Contents for KEB-PM

Page 1: ......

Page 2: ...Page intentionally left blank...

Page 3: ...2019 2019 Smartrise Engineering Inc All Rights Reserved Page i Document History Date Version Summary of Changes October 23 2018 1 0 Initial Submittal August 23 2019 2 0 Changed cover page New documen...

Page 4: ...Drive Startup Manual KEB PM Page ii 2019 Smartrise Engineering Inc All Rights Reserved August 23 2019 Page intentionally left blank...

Page 5: ...on 4 Powering Up 5 Encoder Cable 6 KEB Motor Learn 6 Initial Setup 7 KEB Encoder Learn 7 SPI Encoder Learn 7 Encoder Synchronization 8 Operation 8 No Faults 8 Proper Direction 8 At Speed 8 Under Contr...

Page 6: ...ive Startup Manual KEB PM Page iv 2019 Smartrise Engineering Inc All Rights Reserved August 23 2019 Starting Over Defaulting Drive 15 Vibration 15 Motor Noise 15 Motor Not Running When Given Command 1...

Page 7: ...Inc All Rights Reserved Page v List of Figures Figure 1 KEB PM Drive 1 Figure 2 Example of Parameter Table 1 Figure 3 Ground Bus Terminal 2 Figure 4 Example of Construction Wiring 5 Figure 5 Breakers...

Page 8: ...Drive Startup Manual KEB PM Page vi 2019 Smartrise Engineering Inc All Rights Reserved August 23 2019 List of Tables Table 1 Wiring References for Common Encoders 3 Table 2 Parameter Groups 13...

Page 9: ...e Equipment Settings Verification Set and verify the equipment matches the job specific parameters for proper operation See C4 Controller sheet 01 Getting Started Parameter Table for more information...

Page 10: ...the controller Examples of a proper building to controller ground is as follows Attach the ground wire to the street side of a water main Attach the ground wire to a grounding rod in the pit The cont...

Page 11: ...if equipped to terminals J1 J2 located on the terminal block next to the M Contactor Motor Encoder Perform the following to connect the drive to the motor and encoder cable See C4 Controller sheet 04...

Page 12: ...rm the following to wire the Construction Box See C4 Controller sheet 01 Getting Started for job specific information Connect a jumper from L120 to terminals LFT LFM and LFB If rear doors are used con...

Page 13: ...trise Engineering Inc All Rights Reserved Page 5 Figure 4 Example of Construction Wiring Powering Up Perform the following to power up the drive Apply external power by closing the main disconnect Clo...

Page 14: ...m of 8 inches 20 cm away from all wires having greater than 24 VDC on them For best results run the encoder cable in a separate conduit from the controller to the motor It is absolutely necessary to e...

Page 15: ...For absolute encoders on PM motors if at any time the physical relation between the motor shaft and encoder changes for example encoder replaced encoder slippage etc the encoder position must be rele...

Page 16: ...process No Faults Make sure the car is moving without triggering a fault either on the Smartrise SRU Board or the drive If the SRU Board displays a drive fault look at the drive to see what the fault...

Page 17: ...the brake is not picking make sure that the brake is wired according to C4 Controller sheet 05 Brake Connection and if there is a second brake installed verify that the EB terminal is jumpered to the...

Page 18: ...ights Reserved August 23 2019 Car Moving to Slow or Rough If the car is moving to slow or rough perform the following Swap the A with A phasing by navigating to parameter LE03 and selecting A B Swappe...

Page 19: ...PM August 23 2019 2019 Smartrise Engineering Inc All Rights Reserved Page 11 Appendix 1 Terminal and Encoder Card Locations The figure below shows the terminal and encoder wire terminal locations Fig...

Page 20: ...Drive Startup Manual KEB PM Page 12 2019 Smartrise Engineering Inc All Rights Reserved August 23 2019 Figure 7 Encoder Terminal Location...

Page 21: ...evant motor values and motor protection settings LE01 LE36 Encoder Data Defines the settings and scalings of the drive encoders LN01 LN05 Machine Data Defines the machine data including sheave diamete...

Page 22: ...anual KEB PM Page 14 2019 Smartrise Engineering Inc All Rights Reserved August 23 2019 Parameter Parameter Group Description TS01 TS08 Terminal Slowdown Defines the settings for the NTSD inputs and sp...

Page 23: ...ad Induction Geared and Save Go to step 3 b If the original configuration is Geared navigate to PM Induction Geared and load Induction Gearless and Save Go to step 3 After this value is saved go back...

Page 24: ...Drive Startup Manual KEB PM Page 16 2019 Smartrise Engineering Inc All Rights Reserved August 23 2019 Page intentionally left blank...

Reviews: