WIRING – 

(Check off box when complete) 

** Refer to the Appendix for the following connections **

 

Power – 

(Sheet 3: Machine Room connections) 

 

Connect main line power to terminal block L1/L2/L3.  

 

Connect  the  ground  wire  to  the  yellow/green  terminal  block 
next to L1-L3. 

Brake – 

(Sheet 5: Brakes)

 

 

Connect  the  main  brake  wiring  to  terminals  K1  /  K2  and  the 
secondary brake wiring (if equipped) to terminals J1 / J2 located 
on the terminal block next to the M contactor. 

 

Jump EB to the terminal listed in the Construction box located 
on  “Sheet  01  –  Getting  Started”  and  connect  either  the  rope 
gripper or shieve brake to EBR (if installed). 

Motor / Encoder – 

(Sheet 4: Drive and Motor)

 

 

Connect motor leads to the M contactor at T1/T2/T3. 

 

Connect the encoder cable to the PG Card located under the top 
cover.  The  following  table  contains  wiring  references  for 
common encoders.

 

 

Summary of Contents for Magnetek L1000A

Page 1: ...DRIVE STARTUP MANUAL Magnetek L1000A Drive Permanent Magnet Installation www smartrise us 2601 Fair Oaks Blvd Sacramento CA 95864 916 457 5129...

Page 2: ...le on the drawings Sheet 1 Getting Started matches the actual equipment Below is a sample table showing the important values that will affect operation Sample Sheet 1 Getting Started Motor Volts Motor...

Page 3: ...side of the incoming water main To a grounding rod that has been driven into the pit flooring The controller has a common ground bus terminal connection All grounds need to land at this common point i...

Page 4: ...ls K1 K2 and the secondary brake wiring if equipped to terminals J1 J2 located on the terminal block next to the M contactor Jump EB to the terminal listed in the Construction box located on Sheet 01...

Page 5: ...s if required Pre Transfer Emergency Power Governor IMPORTANT REMOVE FACTORY WIRES ON INPUTS 521 522 o Install the Run Bug Up Down Switch to IO s 521 522 Install the Run Bug Up Down Enable switch to M...

Page 6: ...ck off box when complete Toggle the Inspection Normal switch to the INSP position Set BYPASS TERM LIMITS to YES o On the Smartrise Machine Room controller board press the Left Arrow ESC button several...

Page 7: ...press the enter key o Use the Up Down Arrow keys to change the word NO to YES o Use the RIGHT Arrow key and move the asterix under the word SAVE and press enter o Hit the LEFT Arrow ESC button several...

Page 8: ...ntil the Auto Tuning display appears 4 Press ENTER key to begin setting parameters a Press ENTER key to select the value for T2 01 Set to 1 5 Save the setting by pressing ENTER 6 The display automatic...

Page 9: ...motor nameplate press UP arrow key to confirm and get to Tuning Ready message 3 Press and hold down the M Contactor during the duration of the Auto Tune 4 Press RUN to activate Auto Tuning Auto Tuning...

Page 10: ...ection Make sure the car is moving in the same direction as the control switch on the Run Bug o Go to Troubleshooting Wrong Direction for corrective actions At Speed Make sure that the car is moving a...

Page 11: ...tarted If it has the proper voltage check the following a During a run command check for DC voltage between points K1 K2 and J1 J2 if 2nd brake installed Verify the voltages are also at the Brake Coil...

Page 12: ...12 APPENDIX Terminal Locations Terminal Card location on PG card Encoder wiring terminals GND terminals Main Line terminals L1 L2 L3 Motor terminals T1 T2 T3 Brake terminal block...