background image

 

 

Version 6.00 
Date of editing: 16.09.2022 r. 

Page 3 z 18 

Installation manual 

KWP-O-ES

 

ATTENTION:

 

a.

 

The damper must be installed in such way, that the axis of baffle must be in horizontal or vertical position, 

b.

 

Damper can not be used as formwork for the wall, 

c.

 

Ventilation ducts should be installed that they cannot put any load on the damper, their suspension must ensure 

their full load capacity, 

d.

 

The suspensions of the ventilation ducts connected to the dampers batteries must be made in accordance with 

the instruction of the manufacturer of ventilation ducts, 

e.

 

In place of Z1 and Z2 suspensions, which are installed for the time of assembly of the damper and in place of 

mortar binding, it is possible to use mounting brackets, paying attention to the immobilization of the damper. 

I.

 

INSTALLATION TECHNOLOGY 

 RIGID WALL 

a.

 

Make  an  opening  in  the  wall 

with  the  100  [mm]  (acceptable  80  ÷  120  [mm])  greater  than  the  nominal 

dimensions of the fire damper = B+100 and H+100. 

b.

 

Put  the  closed  fire  damper  into  the  installation  opening  on  depth  marked  by  undercuts  on  the  damper  body 

(dimension 60 mm), from one side fix it with suspension Z1, and from other side fix it to the ventilation duct 

suspended on Z2 suspension. 

c.

 

After  setting  the  fire  damper  as  described,  fill  the  gap  between  the  fire  damper  and  the  wall  with  cement, 

cement-lime mortar, concrete, or PROMASTOP MG III made by PROMAT. 

d.

 

After 48 hours from the installation, the suspensions and supports used during installation of fire damper, may 
be removed. 

 

ATTENTIONS: 

 

Carry out the installation in protective clothing, (gloves, glasses, helmet), 

 

Pay attention at the sharp edges of the sheets, 

 

Damper Baffle axis

 

must be in horizontal or vertical position after montage, 

 

Damper can not be formwork for wall, 

 

Ventilations  duct  should  be  installed  that  they  cannot  put  any  load  on  the  damper,  their  suspension  must 

ensure their full load capacity, 

 

The suspensions of the ventilation duct connected with the damper battery must be done according to 

instruction manufacturer of ventilation ducts, 

 

In place of suspensions Z1 and Z2, which are installed for the time of assembly of the damper and in place 

of mortar binding it can be used mounting brackets, paying attention to the immobilization of the damper. 

Figure 2. Correct preparation of the damper for the installation (using mounting wedge)

 

Summary of Contents for KWP-O-E

Page 1: ...a Installation manual KWP O E S Fire Damper rectangular v https www smay eu ...

Page 2: ...ght to make changes to this document TABLE OF CONTENT INSTALLATION TECHNOLOGY 2 I INSTALLATION TECHNOLOGY RIGID WALL 3 II INSTALLATION TECHNOLOGY FLEXIBLE WALL 5 III INSTALLATION TECHNOLOGY CEILING 6 IV INSTALLATION TECHNOLOGY STRUCTURES THICKER THAN 135 MM 8 V INSTALLATION TECHNOLOGY FOR FIRE DAMPERS IN BATTERIES 8 ...

Page 3: ...tion elements must be compatible with standard 1366 2 Minimal 200 mm between fire damper which are installed in different ventilating wires Minimal 75 mm between fire damper and construction element wall ceiling Before installing fire dampers please read assembly technology recommended by the manufacturer The way of installing recommended by one manufacturer may not be the same for other dampers R...

Page 4: ...er body dimension 60 mm from one side fix it with suspension Z1 and from other side fix it to the ventilation duct suspended on Z2 suspension c After setting the fire damper as described fill the gap between the fire damper and the wall with cement cement lime mortar concrete or PROMASTOP MG III made by PROMAT d After 48 hours from the installation the suspensions and supports used during installa...

Page 5: ...Version 6 00 Date of editing 16 09 2022 r Page 4 z 18 Installation manual KWP O ES Figure 3 Installation method of fire dampers KWP O in rigid wall ...

Page 6: ...al Firesilicone B1 FR c Put the closed fire damper into the installation opening and support or suspend in this way that the minimum installation depth mark is on the plane of the flange surface d After setting the fire damper as described fill the gap between the fire damper and the wall with non flammable mineral wool of high density 80 kg m3 or more e Seal the place of filling with mineral wool...

Page 7: ...een the fire damper and the wall with cement cement lime mortar concrete Under difficult working conditions producer recommend PROMASTOP MG III mortar of production of the PROMAT company d Mount the mounting brackets on each side Number of mounting brackets Side length up to 500 mm 1 pcs Side length from 500 to 800 mm 2 pcs e Housing install with actuator similarly as in the picture Only the lengt...

Page 8: ...Version 6 00 Date of editing 16 09 2022 r Page 7 z 18 Installation manual KWP O ES Figure 6 Installation method of fire dampers KWP O in ceiling ...

Page 9: ...y There are two possibilities of realizing the order of fire damper batteries basic and complete First one covers the set of fire dampers assembly strips and complete set of self tapping screws The purchase of other materials needed such as intumescent gasket PROMASEAL PL PVC SK mineral wool for thermal insulation with minimum density of 60 kg m3 and aluminum tape remains with the Customer The sec...

Page 10: ...ree space between the fire dampers as shown in w1 NOTE The alternative way of wool mounting is to use two layers of wool with thickness of 30 mm In this case apply the fire resistant PROMASTOP Coating with width of 50 mm The mass is placed between the strips of wool and between wool and damper housings c Place the fire damper A on the fire damper B and assemble them together on the front and back ...

Page 11: ...e way of wool mounting is to use two layers of wool with thickness of 30 mm In this case apply the fire resistant PROMASTOP Coating with width of 50 mm The mass is placed between the strips of wool and between wool and damper housings c Place the fire damper B on the fire damper C and assemble them together on the front and back with use of perforated assembly strips 2 and self tapping screws M6x1...

Page 12: ...he openings in fire damper body In order to carry out the correct assembly 4 self tapping screws should be used per each assembly strip with length of 1200 mm c Fill the whole free space between the joint of fire dampers with non combustible mineral wool as shown in w1 NOTE The alternative way of wool mounting is to use two layers of wool with thickness of 30 mm In this case apply the fire resista...

Page 13: ...EP 1 a Fix the gasket on insulating spacer of one of adjoining fire dampers position 1 in the Figure 14 b Set together the sides of fire damper A and the fire damper B where the gasket was fixed and assemble them together on the front and back with use of perforated assembly strips 2 and self tapping screws M6x16 3 which should be tightened into the openings in fire damper body In order to carry o...

Page 14: ...ery size and its arrangement For vertical battery consisting of two KWP fire dampers B1 120 x H1 H2 180 Figure 15 For vertical battery consisting of three KWP fire dampers B1 120 x H1 H2 H3 240 Figure 16 For horizontal battery consisting of two KWP fire dampers B1 B2 180 x H1 120 Figure 17 For battery consisting of four KWP fire B1 B2 180 x H1 H2 180 Figure 18 b Put the battery of fire dampers int...

Page 15: ...Version 6 00 Date of editing 16 09 2022 r Page 14 z 18 Installation manual KWP O ES Figure 13 Installation of a battery consisting of two fire dampers KWP in vertical arrangement in ceiling ...

Page 16: ...Version 6 00 Date of editing 16 09 2022 r Page 15 z 18 Installation manual KWP O ES Figure 14 Installation of a battery consisting of three fire dampers KWP in vertical arrangement in ceiling ...

Page 17: ...Version 6 00 Date of editing 16 09 2022 r Page 16 z 18 Installation manual KWP O ES Figure 15 Installation of battery consisting of two fire dampers KWP in horizontal arrangement in ceiling ...

Page 18: ...Version 6 00 Date of editing 16 09 2022 r Page 17 z 18 Installation manual KWP O ES Figure 16 Installation of a battery consisting of four fire dampers KWP in ceiling ...

Page 19: ...75 0 400 53 9 63 8 73 7 83 0 92 6 98 0 112 7 122 6 131 9 141 8 152 0 177 7 188 5 199 1 500 72 2 83 5 94 1 105 5 116 2 127 5 138 5 149 9 160 2 171 2 199 8 211 5 223 2 600 80 2 92 6 104 7 117 1 129 2 142 0 154 1 166 5 178 9 191 3 222 0 235 5 248 7 700 88 4 102 0 115 2 14 9 142 9 156 8 163 1 176 0 197 3 211 1 247 6 264 9 282 5 800 96 6 111 8 125 8 141 3 155 9 170 9 186 1 200 7 215 7 230 6 266 0 281 6...

Reviews:

Related manuals for KWP-O-E