background image

1/8 

FGX-OM-L010 

 

This operation manual is for model number specified above. please 

confirm the 

  consistency of the operation manual and the model number of the 

product to be 

 used.  

○ 

Read this operation manual carefully and understand its content 

before installing and using the product. 

  Give special attention to safety instructions. 

Keep this operation manual available whenever necessary. 

 

 
 
 

 

 

OPERATION MANUAL

 

 

   

SMC Filter (FGG series) 

 

                       

   

FGG

□□

-20-

A-

 

     

 

                       

 

 

 

 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 

                                                                                   
 

       

   

SMC Corporation

 

INDEX 

 

Safety Instruction

・・・・・・・・・・・・・P2、3 

 

Construction

・・・・・・・・・・・・・・・・P4 

 

Specification

・・・・・・・・・・・・・・・・ P5 

 

Installation / Piping

・・・・・・・・・・・・P5 

 

Operation

・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・P5 

 

Replacement of the element

・ ・ ・ ・ ・ ・P6、7 

 

Packing material 

Select option 

Select element

Element length

Summary of Contents for FGG 20 A Series

Page 1: ...understand its content before installing and using the product Give special attention to safety instructions Keep this operation manual available whenever necessary OPERATION MANUAL SMC Filter FGG series FGG 20 A SMC Corporation INDEX Safety Instruction P2 3 Construction P4 Specification P5 Installation Piping P5 Operation P5 Replacement of the element P6 7 Packing material Select option Select el...

Page 2: ... Do not use in corrosive environment Do not use where exposed to vibration or impact Caution on operation Warning Do not loosen V band while pressure is applied Install V band correctly to specified position See page 7 Replace deteriorated or swollen O ring Replace O ring in one year after starting use or fluid leakage occurs See page 4 Table 1 O ring for replacement When supplying pressure for st...

Page 3: ...ng Caution Ensure the direction of IN OUT for piping Arrange piping so that air discharging work is available Check each port size for selecting valves and fitting suitable for operating conditions Flush piping line with air before operation to check any problem including fluid leakage Fix the feet to the ground firmly using foundation bolt M12 The piping of INLET and OUTLET shall be fixed firmly ...

Page 4: ... space between element AL 25S NBR O ring AL 22S FKM O ring used to seal the sealing part of the cover and the case V band CY 27S SUS304 SWCH Engage the cover and the case and settle Them Cover SUS304 The lid of the product Case SUS304 Main body of the case Foot SS400 Support the body Fix to the ground Description on label BH 73S Tetlon Caution label BH 77S Tetlon Caution When becomes dirty replace...

Page 5: ...nstallation Piping 1 Installation Fix the feet to the ground firmly using foundation bolt M12 Install and arrange piping at the place with enough space for maintenance 2 Piping Check connect port size to use valves and fitting suitable for operating conditions Arrange the piping so that pressure in the product can be released Confirm cautions on page 2 and 3 for use 4 Operation 1 Operation Mount V...

Page 6: ...6 8 FGX OM L010 ...

Page 7: ...sition from where clamping position check pin can be inserted and insert the clamping position check pin See Fig c When tightening nut can not be tightened to specified position position where clamping position check pin can be inserted replace V band and O ring to new ones See table 1 Caution Clean V band and the contact surface between the cover and the case before mounting Dirty contact surface...

Page 8: ...bara UDX 15F 4 14 1 Sotokanda Chiyoda ku Tokyo 101 0021 JAPAN Phone 81 3 5207 8249 Fax 81 3 5298 5362 Specifications are subject to change without prior notice and any obligation the part of the manufacturer 2008 SMC Corporation All Rights Reserved ...

Reviews: