HRX-OM-I051
Chapter 3 Transporting and Installation
HRZ Series
3.3 Procedure for Installation
3-15
Procedure for piping installation
Secure the pipe coupling section with a pipe wrench, and provide proper tightening
to the pipe.
Recommended piping installation
Table 3-4 Recommended Pipe
No.
Name
Size
Material
1
Valve
Rc3/4
Stainless steel
2
Y-strainer (100
m)
Rc3/4
Stainless steel
3
Valve
Rc1/2
Stainless steel
4
Y-strainer (5
m)
Rc1/2
Stainless steel
Pipe coupling section
Figure 3-12 Pipe Tightening
System on the
customer side
Circulating fluid supply
Circulating fluid return
Facility water inlet
Facility water outlet
Figure 3-13 Recommended Piping Installation