- 9 -
2. 4 Procedure
(
How to start the actuator)
Install, wire, set and operate the gateway unit referring to the procedure below when the product is
used for the first time.
(1) Checking the content of the package
After unpacking, check the description of the label to identify the gateway unit and the quantity of
accessories.
(*)
These items are included if you ordered by the part number for a set of controller and actuator.
(2) Mounting the unit
Refer to
3.4 How to install
for the mounting of the gateway unit.
(3) Initial setting of the connect
controller
The parameters of the controller’s, that are is connected to the gateway unit need to be set.
Refer to section
4.4 Setting of controller (LEC)
(4) Setting the unit
It is necessary to set the node address and the communication speed by the rotary switch of the
gateway unit. Refer to section
4. Initial Setting
(5) Unit wiring / Connection
Connect cables to the connectors(CN1 to CN3) of the gateway unit.
Refer to section
5. External connection
for the wiring of connectors.
Part’s name
Quantity
Gateway unit
(
LEC
-
GPR1
)
1 pc.
Power supply connector
1 pc.
Gateway unit
Power supply connector
Connector