background image

 

 

1. 

Measure the inside of the file drawer 
from front to back. This will determine 
the length of the Metal Side Rails. 

2. 

Measure two 

Metal Side Rails (B). 

3. 

If necessary to shorten 

Metal Side 

Rails

, place pliers next to indentation 

closest to the length you need, bend 
back and forth until rail breaks. Use 
file to soften edges, if needed.

 

 

 

4. 

Place each end of a 

Metal Side Rail 

(B) 

into a

 Black Plastic Slide Insert 

(E), 

leaving a small portion of the Side 

Rail extending beyond the Plastic side 
piece, as shown. Set aside

 

 

 

5. 

Remove 

Black Plastic Corner Pieces

 

(

D

) from tree and place 

Corner Piece 

D1 (D)

 on one end of a 

Tie Rod (A)

and 

Corner Piece D2 (D)

 on the other 

end.  

6. 

Lightly tap 

Corner Pieces

 

(D)

 onto 

Tie 

Rod (A)

 until it will go no further. 

 

 

 

7.  Place one end of 

U frame(C)

 into 

Corner Piece (D1)

 and one end into 

Corner Piece (D2).

 

8.  Lightly tap 

Corner Pieces (D)

 onto 

U frame(C) 

until it will go no further. 

9.  Repeat 

Steps 5 through 8

 

 

You will now have the end components of the Hanging Folder Frame.

 

 

10. Place the 

Black Plastic Slide Inserts 

(E) 

on Metal Side Rails into the 

openings of the 

Black Plastic Corner 

Pieces DI & D2. 

11. Slide 

Black Plastic Slide Inserts (E)

 in 

or out of 

Corner Pieces (D)

 to adjust 

for letter, legal or A4 hanging folders.

 

 

 

 

For valuable organization tips and information, visit 

www.smead.com 

 

The Smead Manufacturing Company    Hastings, Minnesota    USA 

D2 

D1 

Reviews: