S E C T I O N 1 2
•
M a i n t e n a n c e
Level 1
®
NORMOFLO
®
H-1129 Irrigation Fluid Warmer | Operator’s Manual
45
Maintenance and Calibration Log
All maintenance and testing should be done by qualified personnel
authorized by the institution to perform such maintenance. Regularly
scheduled maintenance ensures proper functioning of the equipment.
Refer to the table below for required tasks and frequency of routine
maintenance.
Scheduled Maintenance and Calibration Checklist
Task
Every Use Every 30 Days Every 12 Months
Clean the Exterior
General Inspection
Change Recirculating
Solution
Lubricate O-Rings
Disinfect Recirculating
Solution Reservoir
Replace O-Rings
Clean Fan Filter
Perform Over Temperature
Alarm Test
Test Add Recirculating
Solution Alarm
Test Disposable Alarm
Perform Fluid Warmer Alarm
Signal Test
Verify Temperature
Calibration
Electrical Safety Tests