IN TRO DUC TION
1
Kelvin Hughes, or appointed agents, contracts only to
supply the equipment, supervise the installation and
final connection of the equipment. It is recommended that
the installation is made by a fully qualified Kelvin Hughes
Radar Engineer.
2
Forward planning for positioning the various units of
the Radar must be made before any installation work is
carried out. A full survey is required in order to establish the
ship’s fitment. This can be arranged with the Technical
Department of Kelvin Hughes or one of the approved
agencies. Details of Agencies worldwide can be found in
Publication KH 401.
3
This chapter covers Installation of the Mk IV Upmast
Transmitter /Receivers.
4
The diagrams listed in Table 4.1b, provide installation
information for the Transmitter/Receiver Units used in
this system.
MAX I MUM REC OM MENDED WAVE GUIDE
LENGTHS
5
The following maximum waveguide lengths are
recommended:
Std Speed
High Speed
X-band
28m
20m
SYS TEM CON FIG U RA TIONS (SEE FIG URE 1)
6
Combinations of Antennas and Upmast Transceivers
are:
(1) 1.8m X-band 25kW Antenna (CAE-A13/2)
Turning Mechanism/Transceiver (CAE-A12-20)
(2) 2.4m X-band 25kW Antenna (CAE-A25)
Turning Mechanism/Transceiver (CAE-A12-20)
SAFETY NOTES
Ob serve the Health and Safety No tices at the front of
this man ual.
7
Safety personnel must ensure that persons do not
encroach on the area of work.
8
Mains supplies in the vicinity of the Upmast
Transceiver are to be isolated when installing the
equipment.
9
A suitable safety platform or harness should be used
when siting the Upmast Transceiver aloft.
10
The Upmast Transceiver must be hoisted to the fixing
position using a secured block and tackle or rope
straps. The assembly MUST NOT be lifted by the antenna;
the complete unit must be secured and hoisted evenly.
11
The transceiver must be earthed to the ship as shown
on the appropriate illustration.
12
The earthing straps must be fitted prior to switching on
the transceiver.
Amdt 5
4b.1
July 03
KH 2020
Chap 4b
CHAPTER 4B
INSTALLATION & INTERCONNECTIONS - TRANSCEIVER MKIV
Figure
Description
1b
Upmast X-Band Transceiver CAE-A12-20 (25kW):
Installation Dimensions
2b
X-Band Upmast Transceiver: Cable Routing
3b
X-Band Upmast Transceiver Transmitter Monitor
Arm:
Connection Diagram
4b
Assembly of Cable Gland to Upmast
Transceiver/Turning Mechanism
5b
X-Band Upmast Transceiver: Electrical Connections
6b
Optional Mains Isolator: Installation Dimensions
7b
Mk IV Transceiver Upmast (X-Band) to Nucleus
(5000) Interconnections Diagram
8b
MkIV Transceiver Upmast (X-Band) to Radar
Processor via RIU Interconnections Diagram
Table 4.1b - Installation Diagrams
Summary of Contents for Kelvin Hughes Nucleus 3 5000 Series
Page 27: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 ii Amdt 1 KH 2020 Index Introduction ...
Page 73: ...THIS PAGE IS INTENTIONALLY BLANK KH 2020 Chap 2a July 03 2a 6 Amdt 5 ...
Page 101: ...THIS PAGE IS INTENTIONALLY BLANK May 01 3 6 Original KH 2020 Chap 3 ...
Page 109: ...THIS PAGE INTENTIONALLY BLANK July 03 viii Amdt 5 KH 2020 Index Chap 1 3 ...
Page 119: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 x Amdt 1 KH 2020 Contents Chap 4 5 ...
Page 150: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4b 12 Original KH 2020 Chap 4b ...
Page 157: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4c 6 Original KH 2020 Chap 4c ...
Page 163: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4c 14 Original KH 2020 Chap 4c ...
Page 176: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4c 28 Original KH 2020 Chap 4c ...
Page 234: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4f 6 Original KH 2020 Chap 4f ...
Page 257: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4f 30 Original KH 2020 Chap 4f ...
Page 275: ...THIS PAGE IS INTENTIONALLY BLANK July 03 5 18 Amdt 5 KH 2020 Chap 5 ...
Page 279: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 iv Amdt 1 KH 2020 Index Chap 4 5 ...
Page 309: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 xiv Amdt 1 KH 2020 Contents Chap 7 8 ...
Page 356: ...Original 7c 19 May 01 KH 2020 Chap 7c CD 2413 Figure 16c Modulator PCB Switches Test Points ...
Page 359: ...THIS PAGE IS INTENTIONALLY BLANK May 01 7c 22 Original KH 2020 Chap 7c ...
Page 381: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 7d 26 Amdt 1 KH 2020 Chap 7d ...
Page 425: ...THIS PAGE IS INTENTIONALLY BLANK May 01 8a 22 Original KH 2020 Chap 8a ...
Page 445: ...THIS PAGE INTENTIONALLY BLANK July 03 8aA 16 Amdt 5 KH 2020 Chap 8a Annex A ...
Page 463: ...THIS PAGE IS INTENTIONALLY BLANK May 01 8c 12 Original KH 2020 Chap 8c ...
Page 472: ...THIS PAGE IS INTENTIONALLY BLANK May 01 8c 22 Original KH 2020 Chap 8c ...
Page 476: ...THIS PAGE IS INTENTIONALLY BLANK May 01 8d 4 Original KH 2020 Chap 8d ...
Page 498: ...THIS PAGE IS INTENTIONALLY BLANK Original 8e 19 May 01 KH 2020 Chap 8e ...