24
SMOOTH AGILE TRAINER
ASSEMBLY
STEP 5: Assemble the Upright
(A) Assemble the Upright-Left (110) and Upright-Right (111) to the
Handlebar assembly and secure using two M8 x 56mm Allen Head Bolts
(506).
Do not completely tighten M8 x 56mm Allen Head Bolts until
step D.
(B) Place the Upright Assembly to the Base Frame (104) and secure with
M6 x 12mm Allen Head Bolt (520) and 6 x 13 x 1mm Washer (521).
Do not completely tighten M6 x 12mm Allen Head Bolts until STEP 11.
(C) Align the M8x105x20mm Carriage Bolt (519) with M8x20x1.5mm Cup
Washer (517) to thread the Upright and Base Frame, and then use the M8
Nylon Nut to tight (517).
Do not completely tighten M8 Nylon Nut until STEP 11.
(D) Tighten M8 x 56mm Allen Head Bolt (506).
(E) Connect the 8Pin Power Wire-Lower (618) to the 8Pin Power Wire-
Middle (617).
506 X2
517 X4
518 X4
519 X4
520 X8
521 X8
519
102
109
111
506
108
110 506
518
517
520
521
518
521
520
521
517
519
520
521
520
111
110
519
517
518
520
521
521
520
521
520
521
518
517
519
618
617