www.smoothfitness.com
17
ASSEMBLY
STEP 3
:
Assemble the Pedal Arm – Left
(A) Slide the 20x91--M14x25mm Bolt (703) with 20.7x29.1x0.3mm Wave Washer
(706) through the Pedal Arm – Left (103) and Action Handlebar – Left (105)
then secure using one M14 Nut (704).
703
X1
704
X1
706
X1