11
“
A
SSEMBLY
I
NSTRUCTIONS
”
S
TEP
12
–
Console
Cover, Handlebar Sleeve
& Upper Handlebar
Assembly
a. Attach the
Right Console
Cover (35)
and the
Left
Console Cover (34)
around the
Upright Post Assembly (6).
Bolt the
Console Covers
together (34, 35)
by using the
4pcs
Bolts
(M5xp0.8x15mm)(91).
NOTE:
Make sure that the
Right
Console Cover (35)
and the
Left
Console Cover (34)
cover the
Upright Cover
and the lowest layer
of the
Console Bottom Sleeve (33)
as the following illustration shown.
b. Slide the
Right Handlebar Sleeve (44)
onto the
Right Upper Handlebar (9)
.
c. Insert the
Right Upper Handlebar (9)
into the
Right Middle Handlebar (11)
and secure it with the
2 Bolts
(M6xp1.0x35mm)(99)
and
2pcs Nylon Nuts (M6xp1.0)(110)
.
d. Slide the
Right Handlebar Sleeve (44)
down until it touches the middle part of Handlebar.
e. Repeat the process above for the left side.
f.
The assembly process is complete
g. Check that all parts in the assembly directions are fully tightened before you use the equipment.
S
TEP
13
–
AC Adaptor
a. Connect the
Adaptor
to the connector located on the front end of the
Main
Frame (1).
b. Plug the
Adaptor
into an electrical outlet to power up your Vertical Trainer.
Bottom
Console
Sleeve
Summary of Contents for VT-3.4
Page 40: ...40 PRODUCT PARTS DRAWING A...
Page 41: ...41 PRODUCT PARTS DRAWING B...
Page 45: ...45...