ZINGO X-012
© SMP (PLAYGROUNDS) LTD, TEN ACRE LANE, THORPE, EGHAM, SURREY, TW20 8RJ
Page 18
2)
CLAMP RING (half) WITHOUT LOCATION SCREW
i)
Position 2 off Clamp Ring (half) (item 44) at stated height on post and secure using 2 off 1/4” x 1-1/4”
BHCS fixings (item 74). Fully tighten bolts to a maximum torque setting of 20Nm. See FIG.B.
3)
TOP & BOTTOM SOCKETS TO CLAMP RING (half)
i)
Hook over the Clamp Ring (half) both the Top & Bottom Bar Sockets to grip the fixing rail of the
appropriate unit. See FIG.C.
ii)
Align the tapped hole in the Bar Socket Top with the hole in the top of the unit fixing rail and secure the
sockets together using the 1/4” x 5/8” BHCS fixings (item 75). See FIG.C.
iii)
Tighten the BHCS fixings up equally to ensure that the Top & Bottom Bar Sockets pull up square and grip
the unit fixing rail evenly.
iv)
When the unit fixing rail is in the correct position with the legs square and plumb tighten fastenings to a
maximum torque setting of 20Nm.
v)
Once clamp is fully tightened lock each Bar Socket Top to unit fixing rail by screwing into the tapped hole
a 3/8” x 3/8” Set Screw (item 76) for Bar Socket Top (item 46). See FIG.C.
FIG.B
1/4” x 1-1/4”BHCS
FIXING
74
74
44 CLAMP RING
(HALF)
FIG.C
BAR SOCKET
TOP
BAR SOCKET
SET SCREW
1/4” x 5/8”
BHCS
FITTING
UNIT FIXING
RAIL
76
46
75
45
BOTTOM
ISSUE B