ZINGO X-012
© SMP (PLAYGROUNDS) LTD, TEN ACRE LANE, THORPE, EGHAM, SURREY, TW20 8RJ
Page 22
17) Attach in 1 place 1 off Panel Fixing Rail (item 11) to the Clamp Rings that are 800mm above the Deck fixings.
Each end of the Panel Fixing Rail is held between a Bar Socket Top (item 46) and a Bar Socket Bottom (item
45) using 2 off BHCS Fixings (item 75) and should be fixed with the plastic panel fixing inserts on the outside
of the structure. See FIG.17, 18 & FIG.C.
i)
For assembly method see Note 4.4, 3), i) to v).
FIG.17
FIG.18
11
11
NOTE INSERTS ON OUTSIDE
SLIDE POSITION
ISSUE B
Summary of Contents for ZINGO MAGIA X-012/P
Page 2: ...INTENTIONALLY LEFT BLANK ...