12
Snap-On EEWH329A
1.5 GENERAL CAUTIONS
A. DURING THE USE AND MAINTENANCE OF THE
MACHINE IT IS MANDATORY TO COMPLY WITH
ALL LAWS AND REGULATIONS FOR ACCIDENT
PREVENTION.
B. THE ELECTRICAL POWER SOURCE MUST HAVE
A GROUND CABLE AND THE GROUND CABLE OF
THE MACHINE MUST BE CONNECTED TO THE
GROUND CABLE OF THE POWER SOURCE.
C. BEFORE ANY MAINTENANCE OR REPAIRS
ARE ACCOMPLISHED THE MACHINE MUST BE
DISCONNECTED FROM THE AIR AND ELECTRICAL
SUPPLY.
D. NEVER WEAR TIES, CHAINS OR OTHER
LOOSE ARTICLES WHEN USING, MAINTAINING
OR REPAIRING THE MACHINE. LONG HAIR IS
ALSO DANGEROUS AND SHOULD BE KEPT
UNDER A HAT. THE USER MUST WEAR PROPER
SAFETY ATTIRE - GLOVES, SAFETY SHOES AND
GLASSES.
2.0 INSTALLATION
Your new Snap-on EEWH329A
Tire Changer requires
a simple installation procedure requiring only a few
moments.
Follow these instructions carefully to insure proper
and safe operation.
The Tire Changer is delivered mounted to a wooden
skid. Remove tire changer from its mounts carefully,
taking care to avoid any back strain.
Place Changer where proper operation will be
unobstructed to all sides. Install the machine in a
covered and dry place.
Once placed in the desired location the tire changer
must be bolted to the fl oor using only the rear two
mounting holes. Mounting anchors are provided with
machines.
TIRE CHANGER MUST BE ANCHORED TO
CONCRETE FLOOR.
2.1 ELECTRICAL INSTALLATION
BUILDING ELECTRICAL INSTALLATION MUST BE
MADE BY A LICENSED ELECTRICIAN.
Check that the electrical specifi cations of the power
source are the same as the machine. The machine
uses 110v, 60 hz, grounded single phase 20 amp
source. Electric specifi cations are clearly marked on
a label at the rear of the machine.
FAILURE TO PROVIDE PROPER ELECTRICAL
SUPPLY AND GROUNDING WILL CREATE A
SHOCK HAZARD TO THE OPERATOR.
540
2.2 BEAD BREAKER INSTALLATION
The side mounted Bead Breaker could be shipped from
the factory dismounted for a more compact shipping
package.
A.
Cut the plastic tie strap, which secures the Breaker
Arm to the cabinet pivot.
B.
Remove the self locking ring nut from the top of the
pivot pin, slip the pin out of the hole.
C.
Place the Breaker Arm into position and insert the
pivot pin through the holes from the top.
D.
Replace the “C” clip retainer onto the pivot pin.
E.
Locate the spring located at the rear of the pivot
mount. Place the free end of the spring onto the “ear”
located on the Breaker Arm just forward of the pivot.
HINT:
You may tie a small rope or cord onto the free
end of the spring then run the cord through the hole.
Pull the spring end toward the ear and loop free end
over the ear tab.
Summary of Contents for EEWH329A
Page 25: ...25 Snap On EEWH329A Blank Page ...
Page 28: ...28 Snap On EEWH329A ...
Page 51: ...51 Snap On EEWH329A Page blanche ...
Page 54: ...54 Snap On EEWH329A ...