CEBORA S.p.A.
7
3
- MAINTENANCE
WARNINGS
ANY INTERNAL INSPECTION OR REPAIRS MUST BE CARRIED OUT BY QUALIFIED
PERSONNEL.
UNPLUG THE POWER SOURCE FROM THE MAINS BEFORE REMOVING THE
PROTECTIVE COVERS AND ACCESSING THE INTERNAL PARTS.
3.1
- Periodic inspection, cleaning.
Periodically remove any dirt or dust to ensure smooth air flow, and thus keep the internal
elements of the power source cool.
Check the conditions of the output terminals, the output and power cables of the power
source; replace if damaged.
Check the conditions of the internal power connections on the electronic boards; if you find
“loose” connections, tighten them or replace the connectors.
3.2
- Operating sequences.
The following sequences reflect proper machine operation. They may be used as guidelines
for troubleshooting. After each repair, they must be carried out without encountering any error or
impediment.
3.2.1
- Control panel commands and signals.
3.302.221
15/01/07
Summary of Contents for TIG 250 AC-DC
Page 1: ...CEBORA S p A 1 TIG 250 AC DC POWER SOURCE art 236 76 SERVICE MANUAL 3 302 221 15 01 07 ...
Page 35: ......
Page 37: ......