IQH3A IQ 3U Modular Enclosure
www.snellgroup.com
Installation
Issue 2 Rev 2
Page 16
©
2014 Snell Limited
3.
Installation
3.1 Unpacking the Unit
The unit is supplied in a dedicated packing carton provided by the manufacturer and should
not be accepted if delivered in inferior or unauthorized materials.
The contents of the carton are:
•
IQH3A 3U enclosure
•
1 or 2 power supplies
•
2 power cables
•
9-way male-to-female serial extension cable (for initial Gateway setup purposes only)
•
1 BNC Y-piece connector
Unpack the carton carefully and check for any shortages or damage. Report any shortages or
damage to Snell immediately.
3.2 Environment
Although constructed to meet the normal environmental requirements, it is important that
there is a free flow of air at the front and rear to dissipate the heat produced during operation.
Installations should be designed to allow for this.
When rack mounting the equipment, support other than the rack mount ears must be
provided.
When the unit is supplied fitted with two power supplies, ensure that both power supplies
are installed correctly and are powered up.
The ventilation holes of the fan housing must not be obstructed or damage to the fan and
the equipment may result.
The ventilation holes on the rear and front of the unit must not be obstructed or damage to
the equipment may result.