© Trynex International 2008 L1186
8 — 31
Troubleshooting
SP-2400
* Spreader capable of speading most granular bulk material.
MATERIAL
FREE FLOWS
MATERIAL ISSUE
CHECK BAFFLE
LENGTH
18" CORRECT
MATERIAL ISSUE
CHECK BAFFLE
POSITION
SHOULD TOUCH
HOPPERON 3 SIDES
MATERIAL
DOES NOT FLOW
MATERIAL ISSUE
AUGER RUNS
PROPER DIRECTION
AUGER RUNS
BACKWARDS
REPLACE VEHICLE
HARNESS
CHECK CONNECTIONS
AT AUGER MOTOR
FOR REVERSE
POLARITY
POLARITY CORRECT
REPLACE SPREADER
HARNESS
MATERIAL
OBSTRUCTION
REMOVE
OBSTRUCTION
AUGER RUNS
BACKWARDS
RUN 12 VOLT TO
AUGER CIRCUIT ON
SPREADER POWER
CORD
TURN ON
VIBRATOR
SLOW
MATERIAL
FLOW
TURN ON
VIBRATOR
INCREASE
AUGER SPEED
MATERIAL ISSUE
Summary of Contents for SP-2400
Page 9: ...Trynex International 2008 L1186 8 9 SP 2400 Front and Rear Views...
Page 10: ...L1186 Trynex International 2008 8 10 SP 2400 Auger Drive Assembly Parts Breakdown...
Page 12: ...L1186 Trynex International 2008 8 12 SP 2400 Spinner Drive Assembly Parts Breakdown...
Page 14: ...L1186 Trynex International 2008 8 14 SP 2400 Hopper Assembly Parts Breakdown...
Page 16: ...L1186 Trynex International 2008 8 16 SP 2400 Frame Assembly Parts Breakdown...