62
EN
ATyS p M - 542935E - SOCOMEC
13.7. Control / Test operating mode
In this mode the operator has the option of controlling the transfer manually or electrically. Test modes are also available.
13.7.1. Test modes
Tests output
Press the test button
Switch position
I, 0, II check
(PS1, PS0, PS2)
Test off load
sequence
Test on load
sequence
Press test button to choose the position to reach.
TEST
Test off load
Auto
Test on load
Check
No
No
Yes
Yes
Yes
Yes
Afer 5 secs
Afer 5 secs
Afer 5 secs
End
Code
OK
Code
OK
Code
OK
Code
not OK
Code
not OK
End
End
No
No
13.7.2.
Off load test (M-G application only)
This test is possible in automatic or manual mode. It can be considered as a manual genset starting order without switching
over the load to the genset.
Description
•
This mode enables you to test the genset without load transfer.
•
The genset is started and stopped as normal (via the «Gen set start» contact output 73-74) on operator
order.
•
This test is always possible, except during a source loss sequence
I , which is a condition for the test to be
stopped.
•
The test duration can be programmed (TFT time delay).
Activation
•
either on the local HMI, via the test modes,
• or via the D20 interface,
• or via the programmable input,
•
or via communication (for version with COM).