NETYS RT 5 - 7 - 9 - 11 kVA - 551570A - SOCOMEC
92
EN
❶
❷
❹
❸
(Figure 10-28: Install the Lithium-ion Battery Module(s))
1. Follow the same procedures to replace the battery module in the right
battery compartment with a new one, and reassemble the battery pack in
reverse order of the above-mentioned steps, which is
❹
Y
❸
Y
❷
Y
❶
shown in
Figure 7-2
.
2. If the Socomec Manual Bypass is installed behind the lithium-ion battery
pack, please keep the Manual Bypass away from the lithium-ion battery
pack by at least 1cm (0.39”).
3. If you install two lithium-ion battery modules and there is any fault in one of
the two modules, it is suggested that you replace both of the modules at the
same time.