BASIC SAFETY INFORMATION
12
HYD 5K...20KTL-3PH
2.1.7
Repair and maintenance
DANGER
Dangerous voltage!
•
Before carrying out any repair work, first switch off the AC
circuit breaker between the inverter and power grid, and then
the DC switch.
•
After switching off the AC circuit breaker and the DC switch,
wait a minimum of 5 minutes before starting any
maintenance or repair work.
IMPORTANT
Unauthorised repairs!
•
Following the elimination of any faults, the inverter should
be fully functional once more. Should any repairs be
required, please contact a local authorised service centre.
•
The internal components of the inverter must NOT be
opened without the relevant authorisation. Shenzhen
SOFARSOLAR Co., Ltd. assumes no responsibility for any
resulting losses or defects.
2.2
Symbols and signs
CAUTION