background image

SFT2500C 32 in 1 IP to Analog Modulator User Manual

4

4

Chapter 2 Installation Guide

2.1 Acquisition Check

When user opens the package of the device, it is necessary to check items according to packing
list. Normally it should include the following items:

SFT2500C 32 in 1 IP to Analog Modulator

User’s Manual

Power Cord

If any item is missing or mismatching with the list above, please contact local dealer

.

2.2 Installation Preparation

When users install device, please follow the below steps. The details of installation will be
described at the rest part of this chapter. Users can also refer rear panel chart during the
installation.
The main steps of the installation include:

Checking the possible device missing or damage during the transportation

Preparing relevant environment for installation

Installing SFT2500C 32 in 1 IP to Analog Modulator

Connecting signal cables

Connecting communication port (if it is necessary)

2.2.1 Device’s Installation Flow Chart Illustrated as follows

2.2.2 Environment Requirement

Item

Requirement

Summary of Contents for SFT2500C

Page 1: ...SFT2500C 32 in 1 IP to Analog Modulator User Manual...

Page 2: ...he written permission of the copyright owner The contents of this document are subject to revision without notice due to continued progress in methodology design and manufacturing SOFTEL shall have no...

Page 3: ...fications 1 1 3 Appearance and Illustration 2 Front panel Illustration 2 Rear Panel Illustration 2 Chapter 2 Installation Guide 4 2 1 Acquisition Check 4 2 2 Installation Preparation 4 3 1 Login 7 3 2...

Page 4: ...t Web based Network management 1 2 Specifications Input Interface rate 2 GE ports max 64 IP input Max 840Mbps for each GE input Stream UDP UDP RTP 1 7 packets FEC SPTS MPTS Transport Protocol UDP RTP...

Page 5: ...lopment Video signal to noise ratio 60dB Network Interface Management 1 x 100 Base T Ethernet RJ 45 Data 2 x 1000 Base T Ethernet RJ 45 Protocol IEEE802 3 Ethernet RTP ARP IPv4 TCP UDP HTTP IGMPv2 v3...

Page 6: ...2500C 32 in 1 IP to Analog Modulator User Manual 3 3 1 NMS network management port 2 Power Indicator 3 Grounding 4 AC Power Socket 5 Power switch 6 Data Input 7 RF output port 8 RF test port 4 5 6 7 3...

Page 7: ...lation Preparation When users install device please follow the below steps The details of installation will be described at the rest part of this chapter Users can also refer rear panel chart during t...

Page 8: ...ould be no less than 25mm2 2 2 4 Frame Grounding Machine Hall Space When user installs machine frame array in one machine hall the distance between 2 rows of machine frames should be 1 2 1 5m and the...

Page 9: ...ft of front panel User can plug one end of the power cord to the socket and insert the other end to AC power When the device solely connects to protective ground it should adopt independent way say sh...

Page 10: ...ing command to confirm they are on the same network segment For instance the PC IP address is 192 168 99 252 we then change the device IP to 192 168 99 xxx xxx can be 0 to 255 except 252 to avoid IP c...

Page 11: ...P input and then select one channel to parse It will display the interface where users can choose the programs to output Figure 3 Configure Input Area and Output Area with buttons in Operation Area In...

Page 12: ...the right box To select all the input programs To select all the output programs To parse programs time limitation of parsing input programs Parameters Modulator Clicking Modulator it will display th...

Page 13: ...stem Network Click Network it displays the interface as Figure 6 where to set network parameters Figure 6 System Account Click Account it displays the screen as Figure 7 where to set the login Usernam...

Page 14: ...ion it displays the screen as Figure 8 where to set your configurations for the device Figure 8 System Firmware Click Firmware it displays the screen as Figure 9 where to update firmware for the devic...

Page 15: ...FT2500C 32 in 1 IP to Analog Modulator User Manual 12 12 Figure 10 System Reboot Click Reboot it displays the screen as Figure 11 where to check the Reboot Figure 11 To select Kernel log and System Lo...

Page 16: ...tween 0 to 45 C Making sure good ventilation for the heat sink on the rear panel and other heat sink bores if necessary Checking the input AC voltage within the power supply working range and the conn...

Page 17: ...SFT2500C 32 in 1 IP to Analog Modulator User Manual 14 14 Chapter 5 Packing list SFT2500C 32 in 1 IP to Analog Modulator 1 pc Power Cord 1 pc Grounding Cable 1 pc...

Reviews: