Figure 44: Battery screen
If the number displayed is not consistent with the actual installation number of external battery cabinets:
•
Ensure each external battery cabinet contains two battery modules installed on the same row and both have the
locking levers in the locked position�
•
Ensure the IntelliSlot® EBC card is installed properly and the communication cables are fully inserted in the
connectors�
•
Determine that the DIP switch setting of each battery cabinet is correct using the following table
2.5.5 Connecting Integrated Power AC Distribution (PAD)
The rear panel of the SolaHD S5KC UPS provides the capability to add integrated distribution outlets (PADs) as an option
to allow direct AC power connection of the supported equipment to the UPS� These PADs are intended to allow the user
to install and even change distribution, if necessary as equipment changes, while the UPS is still providing power� Follow
these steps to properly and safely add or change the optional PADs�
Battery
SolaHD S5KC Series
2015-05-01
04:27:23
▲
▲
▲
Batt temp (°C)
Discharge count
Discharge hour (H)
Ext batt-cab count
25.0
303
9.4
0
ESC
Table 13: EBC DIP Switch Settings
External Battery
Cabinet Number
DIP Switch Setting
1
2
EBC #1
UP
UP
EBC #2
Down
UP
EBC #3
UP
Down
EBC #4
Down
Down
36 | 2�0
INSTALLATION
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com