11
5. Prepare the UPS or battery
cabinet (the “equipment”) for
rack mounting by following
instructions in the equipment’s
user manual. The equipment
may require additional parts to
be added or parts to be removed
for rack mounting. After it is
prepared, lay equipment on both
sides as shown in the figure at
right with (8) M4 screws provided
in this kit. Make sure retaining latch is
near the rear of the equipment as shown in the figure at right.
6. Open grease packet
provided in this kit. Apply
a 1” long bead of grease four
(4) places inside the bottom,
curved tracks of front
members as shown at right.
The grease will allow the
equipment to slide into the
bracket assemblies more easily.
7. Insert the equipment, with inner members attached from
Step 5
,
into bracket assemblies by inserting top and bottom edges of inner
members into the top and bottom, curved tracks of front members
and sliding the equipment into rack (see figure in
Step 6
). Ends of
inner members are tapered to allow rear of the equipment to be
angled upward before insertion, if space allows.
Then the rear, bottoms edges of inner
members can be placed into front
the equipment can be tipped up into
horizontal position to insert the top
edges of inner members before sliding
the equipment into rack (see figure at right).
The equipment should move smoothly into bracket assemblies. If not,
recheck alignment of front and rear members from
Steps 3
and
4
.
!
UPS or Battery
Cabinet
Front
M4 Screws
M4 Screws
Retaining Latch
UPS or
Battery
Cabinet
Apply
Grease
(inside)
Apply
Grease
!
CAUTION
Lifing equipment into rack may be a two-person job,
depending on weight of equipment. See equipment’s
user manual.