12
8. Secure front of the equipment to rack mounting rails to prevent
the equipment from sliding out of position. If securing holes are
provided on front of the equipment that align with the center holes
on return flange of front members, you can use the four (4) extra
M5 screws provided in this kit to secure the equipment.
Otherwise, the equipment should be secured to front of rack
mounting rails with four (4) customer-supplied fasteners.
9. To orient the display for horizonatal
viewing, remove the front plastic
bezel by pulling forward evenly on
both sides. The unit has two front
panel overlays. Remove the outer
overlay (used for tower installation).
This reveals a horizontally oriented front
panel overlay for rack mounting.
Snap the front bezel back into place.
10. Once the UPS is installed in
the rack, the load may be
connected. Ensure the load
equipment is turned off; plug
all loads into the output sockets
on the rear of the UPS.
11. The input supply cable should
be connected to the electrical
supply distribution in accordance
with local rules and conditions.
12. Turn ON the UPS by pressing the
button; then turn on the connected load equipment. The UPS is now
providing conditioned power to your equipment.
BYP
ASS
UPS
ON
BAT
TER
Y
AC
INP
UT
S O
L A
S4K Indust
rial UPS
!
- +
BYP
ASS
UP
S
O
N
BA
TTERY
AC
IN
P
U
T
SOLA
S4K Industrial UPS
!
- +
Vertical
overlay
for
tower
UPS
Horizontal overlay
for rack UPS
Summary of Contents for S4K2U Series
Page 1: ...S S4K2U Industrial Online Series UPS POWER AVAILABILITY 700 3000VA 120V USER MANUAL...
Page 2: ......
Page 39: ......