55
EN
ca. 10 m
A
B
ca.
20 cm
180°
ca. 10 m
180°
4
1
A
B
A
ca.
20 cm
B
3
1
d 1
4
2
3
1
2
2
d 2
3
2
1
8.3 Checking the leveling accuracy of the horizontal line
1. Select two horizontal, flat walls (A & B), which are
approx. 10 meters apart.
> Mount the iOX5 onto a tripod and position it at a
distance of approx. 20 cm from wall
A
.
> Mark the intersecting point 1 of the vertical and
horizontal line on wall
A
.
2. Rotate the iOX5 by 180° and mark point 2 on wall
B
.
> Position the laser at the same height approx. 20 cm
away from wall
B
and mark point 3 on wall
B
.
3. Rotate the iOX5 by 180° and mark point 4 on wall
A
.
> Measure the vertical distance d1 of the marked
points 1 - 4 and the vertical spacing d2 of the points
2 - 3 .
> Mark the center point of d1 and d2.
> If the reference points 1 und 3 are on different
sides of the center point, d2 must be
subtracted
from d1.
> If the reference points 1 und 3 are on the same
side as the center point, d2 must be
added
to d1.
> Divide the results with double the value of the room
length. The result with twice the value of the room
length.
If the result is greater than 4 mm, the device must be
readjusted. For this, please consult your dealer.
8.4 Checking the leveling accuracy of the lateral axis
> Procedure and calculation as in 8.3 using the lateral
plumbing beams
Та
ше
в
-
Га
лв
ин
г
ОО
Д
www.tashev-galving.com