WATTrouter ECO - user manual
www.solarcontrols.cz
How to fit and setup the device
Page 12 from 66
Figure 4: Three-phase connection with low tariff signal circuit for CombiWATT mode. Current sensing module is placed at the facility’s
supply cable coming from the distribution box where main energy meter is located. The connected loads use only real surpluses
produced by PV-plant. This connection is one of the easiest – only one load (typically boiler or immersion heater) through the
recommended SSR RGC(S)1A manufactured by Carlo Gavazzi.