 Installing the module

 

J

Make sure that the installation is 
carried out safely:

Protect yourself and other persons from falling, 
do not carry out the installation in heavy winds 
and eliminate the risk of falling objects as much 
as possible. Secure the work area in order to avoid 
the endangerment or injury of persons.

 

J

Observe the allowable maximum 
mechanical loading:

Do not exceed the maximum mechanical loading 
and make sure to consider location-specific 
loads such as wind or snow. Remember that the 
module might sag when loaded under certain 
circumstances. In order to avoid damaging the 
module by pointed or uneven structures, do not 
place fasteners or cable ties between the rear of 
the module and the cross section.

 

J

Ensure that the modules are 
grounded properly:

Under the terms of Solar-Fabrik AG, grounding of 
the module frame (if present) and the mounting 
rack is not required for fault-free operation. 
To reduce the risk of electric shock (e.g. due to 
static charge) as far as possible, Solar-Fabrik AG 
recommends to ask an experienced installer to 
carry out a proper grounding. If an external 
lightning protection system has been already 
installed, the PV system has to be integrated 
in the existing lightning protection concept 
by a specialist. Country-specific standards and 
regulations must be observed.

The grounding connections between the modules 
must be checked and accepted by a qualified 
electrician. Furthermore, the main grounding may 
only be connected by a qualified electrician. 

In the USA and Canada, a grounding method 
approved by Underwriters Laboratories (UL) is 
obligatory. 

To provide proper grounding, an optimal electrical 
conductivity is required. For this purpose, 
grounding holes are provided at the rear of the 
module frame (if present).These grounding holes 
are marked by a stamped ground symbol.

Connect the grounding terminal only to the provided and 

marked grounding holes at the rear of the module frame.

Grounding symbol:

For grounding we recommend the Solklip 
grounding terminal with integrated thread-
cutting screw, (UL 467 approved, UL number 
E69905), manufactured by Tyco Electronics. 
Observe the additional instructions at www.
tycoelectronics.com. These grounding terminals 
accommodate  4 mm² (AWG 12) and 6 mm² 
(AWG 10) stripped solid copper wires. The wires 
must not be cut, notched or scratched. No further 
preparation is required.

 

Summary of Contents for Professional 54

Page 1: ...Play it safe Installation guide solar modules Professional Vision...

Page 2: ...d The technical information at the time of production of the product are valid Solar Fabrik AG Freiburg 2014 DIN EN ISO 9001 Quality management system DIN EN ISO 14001 Environmental management system...

Page 3: ...Professional Vision 3 Vision 54 frameless Professional 60 Vision 60 Professional 54 1408TU0710 Installation guide...

Page 4: ...reme Danger due to electrical shock Solar modules generate electricity When exposed to light a voltage occurs which can be dangerous and life threatening Even though the individual modules generate a...

Page 5: ...ss are approved for operation in installations with unrestricted access Professional and Vision modules from Solar Fabrik AG which are qualified under EN 61730 and have been properly installed meet th...

Page 6: ...carry out a proper grounding If an external lightning protection system has been already installed the PV system has to be integrated in the existing lightning protection concept by a specialist Count...

Page 7: ...hen turn the screw another quarter or half turn The thread cutting screw should be torqued by 20 4 lb in and 24 8 lb in 2 3 and 2 8 Nm J J Wire placement Insert the cable into the wire slot Then push...

Page 8: ...taken that the module is not exposed to any negative mechanical or electrical influence from other system components Only connect modules with the same rated current in series and modules with the sa...

Page 9: ...n of heat with adverse effects on the performance can be avoided J J Secure attachment To ensure that modules are installed correctly make sure to securely attach the modules at least four points Fram...

Page 10: ...Vision 60 L C 3 990 340 400 340 400 1677 240 240 500 240 240 500 240 240 1000 Vision 60 Professional 54 L C 3 990 1503 210 210 460 210 210 460 240 240 1000 Professional 54 1408TU0710 Installing the m...

Page 11: ...modules from the back example B using the provided attachment holes Use a torque wrench for installation The required tightening torque for the above samples is 14 8 lb ft 20 Nm Use M6 bolts made of V...

Page 12: ...der to minimize the voltage drop For further connections of the modules only appropriate cables with a minimum conductor cross section of 4 mm must be used J J Protect the wires from adverse environme...

Page 13: ...of automatic cleaning machines for solar energy systems is at your own risk and is not authorised by Solar Fabrik AG in any way Inspect the installation on a regular basis and check it for X X secure...

Page 14: ...Professional Vision 14 1408TU0710 Notes...

Page 15: ...Professional Vision 15 1408TU0710...

Page 16: ...Play it safe Solar Fabrik AG Munzinger Str 10 79111 Freiburg Deutschland Telefon 49 0 761 4000 0 Telefax 49 0 761 4000 199 www solarfabrik de Status 07 08 2014 Document number 1408TU0710...

Reviews: