background image

Professional, Vision

8

1408TU0710

Installing the module

 

J

Ensure comprehensive fire 
protection:

The installation of on-roof systems may influence 
the fire safety of a building. Improperly installed 
systems can present even more of a danger in 
the case of fire. Therefore, the modules of an 
on-roof system must always be installed over 
a fire-resistant surface. As the module is not 
regarded as explosion-proof it must not be 
installed near inflammable gases and vapors e.g. 
close to gas containers, painting installations or 
gasoline stations. Furthermore, the module must 
not be installed next to open fire and flammable 
materials.
 

 

J

Make sure that the surroundings 
are suitable:

The module is designed for use in temperate 
climate. Make sure that after installation 
the module is neither subjected to artificially 
concentrated sunlight, immersed in water or 
continuously splashed with liquids. By all means 
make sure that the module is not subjected to 
abnormal chemical exposure. Therefore, due 
to the expected emissions, installation in the 
immediate vicinity of production facilities is not 
recommended. Exposing the module to extreme 
levels of salt or sulphur may lead to corrosion.

 

J

The correct installation situation

It is very important that the module fulfills the 
technical requirements of the overall system. 
Therefore, care must also be taken that the 
module is not exposed to any negative mechanical 
or electrical influence from other system 
components. Only connect modules with the 
same rated current in series and modules with 
the same rated voltage in parallel. The modules 
may only be operated at the allowable system 
voltage; operation at a higher voltage is not 
recommended. 

 

J

The correct location for installation:

The module must not be installed as overhead 
glazing or vertical glazing, e.g. on a facade. 
Beside the module itself, the mounting system 
must also be suited to the expected conditions 
at the location of installation (snow, wind) and 
withstand them easily. The bottom side of the 
module frame (if present) features holes for 
draining precipitation water. Make sure during 
installation that these holes retain their function. 
For portrait mounting, the junction box may be 
mounted facing up or down on the underside 
of the module. This applies to the Professional 
60 series. Otherwise, the junction box must be 
mounted facing upwards on the underside of the 
module. 

 

J

Yield maintenance through optimal 
alignment and inclination: 

We advise you to familiarize yourself with the 
appropriate alignment and inclination of the 
modules prior to installation in order to ensure 
an optimal system yield. The ideal conditions for 
the generation of electricity are accomplished 
when the sun rays reach the generator surface 
perpendicularly. For modules connected in a 
series, make sure that all modules have the same 
alignment and inclination in order to avoid 
performance losses.

Summary of Contents for Professional 54

Page 1: ...Play it safe Installation guide solar modules Professional Vision...

Page 2: ...d The technical information at the time of production of the product are valid Solar Fabrik AG Freiburg 2014 DIN EN ISO 9001 Quality management system DIN EN ISO 14001 Environmental management system...

Page 3: ...Professional Vision 3 Vision 54 frameless Professional 60 Vision 60 Professional 54 1408TU0710 Installation guide...

Page 4: ...reme Danger due to electrical shock Solar modules generate electricity When exposed to light a voltage occurs which can be dangerous and life threatening Even though the individual modules generate a...

Page 5: ...ss are approved for operation in installations with unrestricted access Professional and Vision modules from Solar Fabrik AG which are qualified under EN 61730 and have been properly installed meet th...

Page 6: ...carry out a proper grounding If an external lightning protection system has been already installed the PV system has to be integrated in the existing lightning protection concept by a specialist Count...

Page 7: ...hen turn the screw another quarter or half turn The thread cutting screw should be torqued by 20 4 lb in and 24 8 lb in 2 3 and 2 8 Nm J J Wire placement Insert the cable into the wire slot Then push...

Page 8: ...taken that the module is not exposed to any negative mechanical or electrical influence from other system components Only connect modules with the same rated current in series and modules with the sa...

Page 9: ...n of heat with adverse effects on the performance can be avoided J J Secure attachment To ensure that modules are installed correctly make sure to securely attach the modules at least four points Fram...

Page 10: ...Vision 60 L C 3 990 340 400 340 400 1677 240 240 500 240 240 500 240 240 1000 Vision 60 Professional 54 L C 3 990 1503 210 210 460 210 210 460 240 240 1000 Professional 54 1408TU0710 Installing the m...

Page 11: ...modules from the back example B using the provided attachment holes Use a torque wrench for installation The required tightening torque for the above samples is 14 8 lb ft 20 Nm Use M6 bolts made of V...

Page 12: ...der to minimize the voltage drop For further connections of the modules only appropriate cables with a minimum conductor cross section of 4 mm must be used J J Protect the wires from adverse environme...

Page 13: ...of automatic cleaning machines for solar energy systems is at your own risk and is not authorised by Solar Fabrik AG in any way Inspect the installation on a regular basis and check it for X X secure...

Page 14: ...Professional Vision 14 1408TU0710 Notes...

Page 15: ...Professional Vision 15 1408TU0710...

Page 16: ...Play it safe Solar Fabrik AG Munzinger Str 10 79111 Freiburg Deutschland Telefon 49 0 761 4000 0 Telefax 49 0 761 4000 199 www solarfabrik de Status 07 08 2014 Document number 1408TU0710...

Reviews: