SAB12-0669_02_Installation and Maintenance Manual SFxxx-S
12
8. Operation
Prior to connecting the PV system to the grid, make sure the entire system has been checked, tested and approved in
accordance with the applicable regulations.
Depending on local regulations and utility policies, connection to the grid and start up of the PV system may only be
performed by authorized personnel.
9. Maintenance
A monthly visual check is highly recommended in order to maintain the efficiency of SF PV modules and the security of the
mounting.
Remove any dirt, fallen leaves or bird droppings from the surface, and check that there is no damage to the surface.
Do not use detergent or chemicals for cleaning dirt off SF PV modules as it may damage the modules and result in
degradation of insulation.
Do not use hard brushes or any other hard materials; use only soft cloths or sponges for removing dirt from the SF PV
modules surface.
When replacement parts are required, be sure the installer/servicer uses parts specified by the manufacturer with the
same characteristics as the original parts. Unauthorized substitutions may result in fire, electric shock, or other
hazard.
Stop using SF PV modules when any damage or unusual phenomena are observed. Have them immediately replaced
or removed by a qualified technician.
10. Disposal
SF PV modules must be disposed of in a responsible manner. Please contact your local supplier or disposal company for
further information. For health and safety reasons, SF modules should not be disposed of with household garbage, and
must be dealt with in accordance with local codes and regulations.
Solar Frontier is a member of PV Cycle, marking its commitment to the environment and public safety. PV Cycle
’
s
initiatives can be found at: http://www.pvcycle.org/
Solar Frontier
Solar Frontier Americas Inc.
2099 Gateway Place
Suite 310
San Jose, CA 95110
USA
Tel: +1 408 916 4150
Solar Frontier Europe GmbH
Bavariafilmplatz 8
82031 Grünwald bei München
Germany
Tel: +49 89 92 86 142 0
Solar Frontier K.K. (HQ)
Daiba Frontier Building
2-3-2 Daiba, Minato-ku
Tokyo 135-8074
Japan
Tel: +81 3 5531 5626
www.solar-frontier.com
Summary of Contents for SF135-S
Page 10: ...6 9...
Page 11: ......
Page 14: ...8 9 B B BB 1 BB BB BB ABBB B CCC 1...
Page 18: ......
Page 49: ...SAB12 0669_02_Installation and Maintenance Manual SFxxx S 13...