Solar Venture 300W PV Array Operator and Maintenance Manual
October 2020
12
|
Deploy the PV Array Support Frame
Locking pins in
storage position
Transport strap
A
B
C
D
E
Loosen the transport strap securing the foldable array support frame (Figure 5A). Remove the
two locking pins (Figure 5B) to allow the frame to expand. Expand the support frame (Figure 5C)
and install the locking pins in the “deployed” position (Figure 5D) after the support frame is fully
extended (Figure 5E).
Tensioning clamps
Locking pins in
deployed position
Figure 5. Deploying the PV array support frame