SYSTEM SETUP AND OPERATION GUIDE FOR THE SOLAR STIK USAF G-BOSS MEDIUM AND HEAVY HYBRID POWER SYSTEM
PRELIMINARY DRAFT
3 PDM 3000: PDU and/or Tower Operation
After the Hybrid Power System has been calibrated, turn on the PDM 3000 breaker(s)/switch(s) for
the circuit(s) in use (Tower and/or PDU). Turn off PDM 3000 breaker(s)/switches for circuit(s) not in
use.
4 System Deactivation
Power down the PRO-Verter before disconnecting ESMs.
Modes of Operation
Hybrid Mode
The System supports the load from energy stored in ESMs. The PRO-Verter automatically starts
the generator to charge depleted ESMs and maintain support of loads. The generator stops when
ESMs are charged fully.
1. Press CTRL button.
2. Scroll to “03 Gen Control”. Press SELECT.
3. Rotate SELECT dial until ”Generator AUTO” appears on the LCD. Press SELECT.
Invert Mode (optional)
Supports AC loads from energy stored in the ESMs when AC power is not available. This mode
requires external DC recharging sources such as renewables or vehicular power to maintain ESM
state of charge.
Prior to System breakdown, charge the System batteries fully
• Start the generator manually. CTRL>03 Gen Control>ON. Allow the generator to run until the
charging amps drop to 3–4 A, as reported by the LCD User Interface home screen.
• The amount of time required for the charging amps to decrease to this level will be a function of
the System batteries state of charge prior to charging.
CTRL
01 AC In Control
Auto Connect
02 CHG Control
Multi-Stage
03 Gen Control
AUTO
Set Gen Control
AUTO
Set Gen Control
ON
Set Gen Control
OFF
P
R
R
System Breakdown and Storage