December 2020
|
Solar Stik
®
, Inc.
42
|
SYSTEM SETUP AND OPERATION GUIDE FOR THE SOLAR STIK USAF G-BOSS MEDIUM AND HEAVY HYBRID POWER SYSTEM
PRELIMINARY DRAFT
[Status/Fault]
05 BMK Meters
Status
06 ACLD Meters
Status
07 PT Meters
Features not utilized by
PRO-Verter 5000
METER
04 AGS Meters
Auto
04A AGS Status
[AGS Status]
04B DC Volts-AGS
## VDC
04C Gen Run Time
##.# Hrs
04E Since Gen Run
## Days
04D AGS Temp
##F
04F Since 100%
## Days
04G Hour Meter
##### Hrs
AC In
Start Amp
Fault Amp
Fault Test
Gen Cooldown
Start Exercise
Fault Exercise
Fault Time
Gen Warm-up
Start SOC
Fault Gen Run
Fault Topoff
Manual Run
Start Temp
Fault MaxRn
Fault VDC
No Comm
Start Test
Fault SOC
Fault 100% SOC
(No AGS present)
Start Time
Off
Start
Topoff
Quiet Time
Start VDC
Ready
Start 100% SOC
Available Statuses Windows in 04A:
05A BMK Status
05B Battery SOC
Think’n
BMK Ready
No Comm (No
BMK)
Factory Fault
Power-up Fault
Unknown Fault
##
Think’n
###%
Factory Fault
Power-Up Fault
Unknown Fault ##
05C DC Volts-BMK
28.28 VDC
05A Statuses:
05B Readings:
05D DC Amps-BMK
140 ADC
05E DC AH In/Out
10 AH
05F Reset AH In/Out
### AH
05G Total AH Out
### AH
05H Minimum VDC
### VDC
05I Maximum VDC
XXX VDC
05J Days Since
100% SOC X
Resettable
menu
selections.
Press and
hold rotory
dial for 3
seconds to
reset values.
METER Button Menus continued