167
Ingeteam
45.2
INGECON® SUN 3Play TL
Termination
Addressing
Interface
Jumper
Yes
RS485
Supported models:
•
INGECON® SUN 3Play 10TL
•
INGECON® SUN 3Play 15TL
•
INGECON® SUN 3Play 20TL
•
INGECON® SUN 3Play 28TL
•
INGECON® SUN 3Play 33TL
Note:
The SUN 3Play TL models have 3 phase and 1 MPP tracker.
Overview:
•
Integrated interface.
•
3-pin wiring.
•
Communication address must be allocated.
•
Installation steps:
•
Switch off the inverters and Solar-Log™.
•
Install the RS485 interface in the inverter.
•
Connect inverters to the Solar-Log™.
•
Connect the inverters to each other.
•
Allocate communication address.
Connect inverters to the Solar-Log™
The wiring is done using a
•
self-made, shielded 3 wire data cable and terminal block connector.
Procedure
1. Open the inverter as shown in the inverter‘s instructions.
2. Pull the free wires through the wire opening in the inverter.
3. If you are making the cable yourself, connect the wires as shown in the following diagram:
Solar-Log™ terminal strip connector
Inverter terminal strip
Terminal
Terminal
►
1
►
Pin 1 RS485 A (+)
►
3
►
Pin 6 GND
►
4
►
Pin 2 RS485 B (-)
4. If no further inverter connected, terminate the inverter:
Insert jumper into the RS485 card.
5. Close the inverter if no other inverters are to be connected.
6. Insert the terminal block connector into the Solar-Log™ RS485 socket.
Summary of Contents for Solar-Log
Page 1: ...1 Components Connection Manual V 4 2 3 Solar Log EN ...
Page 20: ...20 01 Inverter ...
Page 398: ...398 Appendix 113Appendix 113 1 SMA mixed wiring Fig SMA mixed wiring ...
Page 402: ...402 02 Meter ...
Page 444: ...444 03 Battery Systems ...
Page 456: ...456 sonnen Note Only one battery system can be connected to a Solar Log device ...
Page 463: ...463 04 Heating rods ...
Page 470: ...470 05 Heating pumps ...
Page 478: ...478 06 Sensors ...
Page 488: ...488 07 Pyranometer ...
Page 495: ...495 08 Smart Plug components ...
Page 502: ...502 09 Power Charging Stations ...